SOFTWARE DEVELOPMENT PROJECT MANAGEMENT BASED ON WORK BREAKDOWN STRUCTURE AND ODOO ERP

  • Supriyono Informatics Engineering, Faculty of Science and Technology, Universitas Islam Negeri Maulana Malik Ibrahim Malang, Indonesia
  • Nur Chasanah Information Systems, Faculty of Engineering, Universitas Jenderal Soedirman, Indonesia
Keywords: Blackbox Testing, Odoo ERP, Software Development, Software Project Management, Work Breakdown Structure

Abstract

Software Development Project Management is the most important part of the Software Development Life Cycle process. The stages in project development include Initiating, Planning, Executing, Monitoring and Controlling, and Closing. This research uses the Work Breakdown Structure approach, which is a method used in project management to break down complex work into smaller and more manageable parts. Work Breakdown Structure helps in organizing, classifying, and describing the work to be done in a project. Odoo ERP is part of the tools that can be used for project management. Testing the project module using Blackbox Testing. The test scenario includes functional testing of the project management module. Application testing shows good results and is following existing needs. The results show that software project management using the Work Breakdown Structure approach can be implemented properly with Odoo ERP tools.

Downloads

Download data is not yet available.

References

B. Kim, “Dependence Modeling for Large-scale Project Cost and Time Risk Assessment : Additive Risk Factor Approaches,” pp. 1–20, 2020.

A. Sharon, D. Dori, and S. Member, “A Project – Product Model – Based Approach to Planning Work Breakdown Structures of Complex System Projects,” pp. 1–11, 2014.

S. Supriyono and S. Sutiah, “Pengembangan manajemen proyek pembelajaran berbasis ICT menggunakan metode accelerated SAP pada Odoo ERP,” Semin. Nas. Inov. Teknol., pp. 27–30, 2019, [Online]. Available: https://proceeding.unpkediri.ac.id/index.php/inotek/article/view/509.

T. Wang and H. Chen, “Automation in Construction Integration of building information modeling and project management in construction project life cycle,” Autom. Constr., vol. 150, no. August 2022, p. 104832, 2023, doi: 10.1016/j.autcon.2023.104832.

S. Supriyono and S. Sutiah, “Improvement of Project Management Using Accelerated SAP Method in the Odoo ERP,” pp. 1–9, 2020, doi: 10.4108/eai.3-8-2019.2290729.

J. Y. Wu and L. T. Chen, “Odoo ERP with Business Intelligence Tool for a Small-Medium Enterprise : A Scenario Case Study,” pp. 323–327, 2020.

S. H. Almugadam, B. I. Bashir, A. A. A. Hassan, and M. A. A. Adam, “Developing tool for Odoo platform,” Proc. - 2017 Int. Conf. Commun. Control. Comput. Electron. Eng. ICCCCEE 2017, 2017, doi: 10.1109/ICCCCEE.2017.7867677.

N. T. Herawati, “Factors that in fl uence fi nancial self-e ffi cacy among accounting students in Bali,” vol. 13, no. 1, pp. 21–36, 2020, doi: 10.1108/JIEB-02-2019-0010.

S. Mekruksavanich, “An adaptive approach for automatic design defects detection in object-oriented systems,” 2nd Jt. Int. Conf. Digit. Arts, Media Technol. 2017 Digit. Econ. Sustain. Growth, ICDAMT 2017, pp. 342–346, 2017, doi: 10.1109/ICDAMT.2017.7904988.

F. Aktas and F. Buzluca, “A Learning-Based Bug Predicition Method for Object-Oriented Systems,” Proc. - 17th IEEE/ACIS Int. Conf. Comput. Inf. Sci. ICIS 2018, pp. 217–223, 2018, doi: 10.1109/ICIS.2018.8466535.

A. N. Sisyukov, V. K. Bondarev, and O. S. Yulmetova, “ERP Data Analysis and Visualization in High- Performance Computing Environment,” pp. 509–512, 2020.

D. Perdanakusuma, W. Puspitasari, and M. Saputra, “Utilizing Open ERP for Creating Medical Record Management System in Smart Hospital : A Case Study,” pp. 1–7, 2020.

U. Al Faruqi and S. Harso Supangkat, “Smart Learning Platform Framework Based on Smart Learning Environment,” 7th Int. Conf. ICT Smart Soc. AIoT Smart Soc. ICISS 2020 - Proceeding, 2020, doi: 10.1109/ICISS50791.2020.9307576.

T. Semiawan and M. Middleton, “Strategic information planning and campus information systems development in Indonesia,” Campus-Wide Inf. Syst., vol. 16, no. 2, pp. 70–76, 1999, doi: 10.1108/10650749910272025.

F. F. Tananto et al., “BUSINESS PROCESS REENGINEERING SUPPLY CHAIN MANAGEMENT SYSTEM BASED BLOCKCHAIN USING BPR LC BUSINESS PROCESS REENGINEERING SISTEM SUPPLY CHAIN MANAGEMENT,” vol. 4, no. 2, pp. 291–300, 2023.

H. M. Astuti, F. A. Muqtadiroh, E. W. T. Darmaningrat, and C. U. Putri, “Risks Assessment of Information Technology Processes Based on COBIT 5 Framework: A Case Study of ITS Service Desk,” Procedia Comput. Sci., vol. 124, pp. 569–576, 2017, doi: 10.1016/j.procs.2017.12.191.

Z. Minchev, “Digital Society Future Transformation Perspectives in the Informational Age,” Proc. - 2020 IEEE 11th Int. Conf. Dependable Syst. Serv. Technol. DESSERT 2020, pp. 381–388, 2020, doi: 10.1109/DESSERT50317.2020.9125057.

R. Rooswati and N. Legowo, “Evaluation of IT Project Management Governance Using Cobit 5 Framework in Financing Company,” Proc. 2018 Int. Conf. Inf. Manag. Technol. ICIMTech 2018, no. September, pp. 81–85, 2018, doi: 10.1109/ICIMTech.2018.8528192.

S. H. Salih and S. Abdelsalam, “Critical Success Factors for ERP Systems ’ Post-Implementations of SMEs in Saudi Arabia : A Top Management and Vendors ’ Perspective,” vol. 10, no. August, 2022.

S. Supriyono, “Software Testing with the approach of Blackbox Testing on the Academic Information System,” Int. J. Inf. Syst. Technol., vol. 3, no. 2, pp. 227–233, 2020.

M. H. Mirzamohammadi, “The feasibility of E-Learning implementation in an Iranian university,” Electron. J. e-Learning, vol. 15, no. 5, pp. 423–432, 2017.

P. M. Jacob and M. Prasanna, “A Comparative analysis on Black box testing strategies,” Proc. - 2016 Int. Conf. Inf. Sci. ICIS 2016, pp. 1–6, 2017, doi: 10.1109/INFOSCI.2016.7845290.

Published
2023-08-21
How to Cite
[1]
S. Supriyono and N. Chasanah, “SOFTWARE DEVELOPMENT PROJECT MANAGEMENT BASED ON WORK BREAKDOWN STRUCTURE AND ODOO ERP”, J. Tek. Inform. (JUTIF), vol. 4, no. 4, pp. 893-898, Aug. 2023.